Hospitality

JW Marriott Resort and Convention Center

A new 4 star, 1,006 room hotel and 285,000 square foot convention center located in San Antonio, TX. Completed in March, 2009. TAB Technologies was contracted to balance the air and water per the specifications. The air side incorporated massive built-up units, air units serving variable volume terminal units, fan powered units, and a multitude […]

Joule Hotel

The Joule Hotel project involved the restoration of this 10 story, 129 room, 1920’s neo-gothic landmark. Complete renovation included the addition of Charley Palmer’s Steakhouse. The contract was completed January, 2008. TAB Technologies was contracted to perform all air and hydronic Test and Balancing services on this project.   View List of All Hospitality

Omni Hotel

A new 4 star, 30 story hotel/condo structure located in Fort Worth, Texas. The hotel phase opened January 2009, with the completion of the condo phase in the summer of 2009. TAB Technologies was contracted to balance the air and water per the specifications. The air side consisted of air units serving variable volume terminal […]

Hilton Convention Center

New 32 floor, 4 star hotel and condominium facility in Austin, Texas. Project completed in spring 2004. TAB Technologies performed the air and hydronic Test and Balancing services for the HVAC systems. Also acted as the Owner’s liaison in commissioning and demonstrating the life safety systems for the code authorities. View List of Hospitality Projects

Great Wolf Lodge

Great Wolf Lodge is a hotel/indoor water park facility located in Grapevine, Texas. Phase 1 was completed in March of 2008 and Phase 2 was completed in November 2008. TAB Technologies was contracted to perform the air and water balance on the facility. The air systems contained outside air units, make-up air units, individual room […]